FactBox.

BOP de Tarragona · 12 Nov 2026 · 20 vistas

Vinyols i els Arcs approves a park-and-ride facility for 795,261 euros

Por FactBox Admin

Vinyols i els Arcs aprova un aparcament dissuasiu de 795.261 euros

The Local Governing Board of the Vinyols i els Arcs City Council initially approved the works project for the urbanization of a park-and-ride parking lot in the municipality, with a contract budget of 795,261.69 euros, VAT included. The agreement was adopted unanimously in an extraordinary session on November 11, 2026, and is published in the Official Gazette of the Province of Tarragona on November 12, 2026 (CVE 2026-10693, p. 1-1). The project is subject to public review for thirty days.

The published text contains the full agreement of the extraordinary session, electronically signed by the mayor, Arnau Guasch Girona, on November 11, 2026, at 09:23 hours. The insertion of the announcement in the official gazette is the procedure that activates the public exhibition of the project and opens the way for interested parties to submit allegations before final approval.

This is an urbanization action—that is, the civil work required to make the space intended for park-and-ride parking usable and equipped—and not a simple land reservation or a regulatory modification. The file reaches the gazette with the dual status of initial technical approval and the opening of the allegations period.

A budget of 795,261.69 euros including VAT

The agreement sets the economic reference figures for the project, which the BOP details in two distinct amounts:

  • Contract budget, VAT included: 795,261.69 euros.
  • Material execution budget: 552,303.42 euros.
  • Public information period: thirty days.
  • Publication: Official Gazette of the Province of Tarragona of November 12, 2026, p. 1-1, CVE 2026-10693.

The difference between the material execution budget and the contract budget corresponds to the concepts that the specifications incorporate beyond the direct cost of the work, and it is the second amount that determines the economic magnitude of the tender.

Technical drafting and project supervision

The project was drafted by Josep Barberillo Nualart, an industrial engineer, according to the municipal agreement. The published document does not include the drafter’s professional registration number, which appears omitted from the text of the announcement.

The agreement also records a relevant point of the procedure: the project has not been verified by the project supervision office. The reason stated in the gazette is that the works to be executed do not affect the stability, safety, or watertightness of the constructions.

Thirty days to submit allegations

The second point of the municipal agreement establishes the participatory procedure and the means of consulting the project:

  • Public information for a period of thirty days.
  • Announcement inserted in the Official Gazette of the Province of Tarragona and on the municipal notice board.
  • Telematic consultation of the executive project at the electronic headquarters of the Vinyols i els Arcs City Council.

During this period, interested parties may submit any allegations they deem relevant against the initially approved project.

The operation positions the park-and-ride facility as the most prominent municipal investment of the November 12 edition and confirms the council’s intention to provide the municipality with parking space linked to access to the town center. For residents and sector companies, the publication opens the actual project calendar: thirty days for allegations and, subsequently, the tendering of a contract worth nearly 800,000 euros.


Fuente: Official Gazette of the Province of Tarragona, November 12, 2026 edition, Section I, p. 1-1 (official reference: CVE 2026-10693).