Public information for the Sellent Hive photovoltaic plant in Càrcer
Por FactBox Admin

The Official Gazette of the Generalitat Valenciana submits for public information the requests for prior administrative authorization, administrative construction authorization, and declaration of public utility, specifically for the Inst. Sellent Hive photovoltaic plant and its evacuation infrastructure, in the municipality of Càrcer (Valencia). The announcement, signed by the head of the Territorial Service of Industry, Energy and Mines of Valencia, Roberto Javier Anchel Añó, is published in DOGV no. 10464, of October 2, 2026, section V (Announcements), with the official reference DOGV-C-2026-30512 and file ATALFE/2023/39/46. The installation is subject to an environmental impact report.
The legal framework and the deciding body
The procedure is supported by Decree-law 14/2020, of August 7, of the Consell, on measures to accelerate the implementation of renewable energy utilization facilities; Law 24/2013, of December 26, of the electricity sector; Royal Decree 1955/2000, of December 1, and Law 39/2015, of October 1, on the common administrative procedure.
The competent body to authorize the installation is the Territorial Service of Industry, Energy and Mines of Valencia, of the Third Vice-Presidency and Department of Environment, Infrastructure, Territory and Recovery. The environmental impact report corresponds to the General Directorate of Urbanism, Landscape and Environmental Assessment of the same department.
The promoter is the company Sun Hive 86, SL, with NIF B05417480 and registered office at plaza Paseito de Ramiro, 3, Alicante. The declared budget of the project amounts to 2,913,102.79 euros.
Technical characteristics of the plant
The plant is projected with an installed capacity of 4 MW and a peak capacity of 4.84 MWp, on lands of polygons 11 and 12 of Càrcer. Its main elements are:
- 8,722 photovoltaic modules of 555 Wp, on a fixed single-post driven structure and 355 single-axis trackers.
- 16 inverters of 250 kVA, with a nominal power of 4,000 kW.
- Two transformation centers (CT1 and CT2), each with a 2.5 MVA transformer and a ratio of 0.8/20 kV, in prefabricated concrete buildings.
- A Delivery and Measurement Center (CEM) with high-voltage switchgear and a 50 kVA auxiliary transformer.
The evacuation line is overhead-underground: 695 underground meters between the CEM and the first support, 203 overhead meters to cross the Sellent river, and 2,248 underground meters to the independent sectioning center. The connection point with the distribution network is located at the S31 Sumacarcer 20 kV of the ST Vallecarcer, between supports 854411 and 854408.
Affected parties, deadlines, and allegations
The file includes the list of affected assets and rights, with 14 plots in Càrcer, most of which are public roads owned by the Càrcer City Council, in addition to private orange grove cultivation lands and a plot belonging to the Júcar Hydrographic Confederation. Among the private owners are Rubén Bisbal Parra, Juan Enrique Bravo Soler, and the heirs of José García Pons.
The documentation is available at the electronic addresses of the Conselleria and in person at the Territorial Service of Industry, Energy and Mines of Valencia, at calle Gregorio Gea, 27, in València. Allegations may be submitted within a period of 30 business days from the day following publication, via electronic means or through the methods specified in article 16 of Law 39/2015.
The publication opens the formal period for citizen participation regarding an energy project that will occupy agricultural land and affect roads and a riverbed in the Ribera Alta region; therefore, the allegations from individuals, the city council, and basin organizations will determine the environmental and territorial conditions of the authorization.
Source: Diari Oficial de la Generalitat Valenciana, no. 10464, of October 2, 2026, section V (Announcements), pág. 1-5 (official reference: DOGV-C-2026-30512).