FactBox.

Boletín Oficial de Aragón · 28 Sep 2026 · 6 vistas

The Aragonese Institute of Environmental Management formulates the declaration for Barrachina II

Por FactBox Admin

El Instituto Aragonés de Gestión Ambiental formula la declaración de Barrachina II

The Aragonese Institute of Environmental Management (INAGA) has formulated the environmental impact statement for the “Barrachina II” photovoltaic plant project, with 47.32 MW, in the municipality of Argente (Teruel). The resolution, dated August 11, 2026, is published in the Official Gazette of Aragon on September 28, 2026, number 188, via an announcement from the Department of Environment and Tourism. The file, promoted by Energías Renovables de Gladiateur 55, SL, is identified by number 500306/01L/2025/04876.

The announcement is based on article 33.4 of Law 11/2014, of December 4, on Environmental Prevention and Protection of Aragon, which mandates the publication of such resolutions in the “Official Gazette of Aragon.” The text specifies that the file was processed within the Aragonese Institute of Environmental Management itself, a body dependent on the Department of Environment and Tourism of the Government of Aragon.

INAGA is the environmental body of the autonomous community responsible for processing and resolving environmental impact assessment procedures for the projects assigned to it. Law 11/2014 regulates these procedures and establishes the obligation to publicize the resolutions that conclude them.

The resolution is dated August 11, 2026, while the announcement providing publicity was signed in Zaragoza on September 17, 2026, by Diana Remón Galindo, Head of Technical Area III of Industrial Environment. The document appears in section V, “Announcements,” subsection b) “Other announcements,” of the gazette.

Basic data of the file

The announcement summarizes the essential data of the processed procedure:

  • File number: 500306/01/2025/04876.
  • Holder: Energías Renovables de Gladiateur 55, SL.
  • Affected municipality: Argente (Teruel).
  • Description: environmental impact statement.
  • Power: 47.32 MW, limited to 41.58 MW by control system.
  • Location: new location.

File consultation and verification

The complete information of the resolution can be consulted at the link https://aplicaciones.aragon.es/inachkdoc/, with the Secure Verification Code CSVXB7D5ZL8VZBAKBREG. The announcement is published with the code BOA20260928020 in the Official Gazette of Aragon number 188, corresponding to September 28, 2026.

The environmental impact statement is the pronouncement through which the environmental body determines the conditions to which the project is subject. In this case, the pronouncement affects an electric generation facility of 47.32 MW located in the municipality of Argente, in the province of Teruel.

Impact on the territory

Publication in the official bulletin provides public record of the resolution and allows interested parties to consult the full content of the file via the link provided by the Government of Aragon. The project is located in a municipality in Teruel and its owner is the company Energías Renovables de Gladiateur 55, SL.

The INAGA resolution thus conditions the development of a 47.32 MW photovoltaic installation in Argente (Teruel). For the residents and the territory, the announcement represents the official record of the environmental conditions set for the project, which can be consulted using the code CSVXB7D5ZL8VZBAKBREG.


Source: Official Bulletin of Aragon, number 188, of September 28, 2026, section V “Announcements”, section b) “Other announcements” (official reference: BOA20260928020).