Boletín Oficial de Aragón · 06 Oct 2026 · 22 vistas
Aragón opens public information period on the electrical reform from Esplús to Valonga
Por FactBox Admin

The Provincial Service of Huesca, under the Department of Economy, Competitiveness and Employment of the Government of Aragon, has opened for public review the request for prior administrative and construction authorization for the project “Reform of LASMT 25 kV Esplús to CT LE01031 Valonga”, in the municipality of Belver de Cinca (Huesca). The announcement is published in the Official Gazette of Aragon number 194, dated October 6, 2026, with the official reference BOA20261006017 and file number HU-SP-ENE-AT-2022-160. The promoter of the action is Edistribución Redes Digitales SLU.
Regulatory Framework and Competent Body
The process is initiated in accordance with Article 125 of Royal Decree 1955/2000, of December 1, which regulates the activities of transport, distribution, marketing, supply, and the authorization procedures for electrical energy installations, and Article 69 of Law 1/2021, of February 11, on administrative simplification in Aragon.
The substantive body competent to resolve the prior administrative and construction authorization is the Provincial Service of Huesca, which also acts as the processing body. The publication also serves for the purposes of notification provided for in Article 45 of Law 39/2015, of October 1, on the Common Administrative Procedure of Public Administrations.
The project already has an environmental ruling: the Resolution of July 2, 2026, from the Aragonese Institute of Environmental Management (INAGA) adopted the decision not to subject the action to the ordinary environmental impact assessment procedure and issued the corresponding environmental impact report, with file number INAGA 500201/01B/2023/07840.
Dismantling of 82 Supports and 21 New Structures
The reform takes place between support number 35 (former number 42) and the transformation center CT LE01031 Valonga. The published technical characteristics are as follows:
- 82 supports and 3,938.08 meters of LA-110 conductor line are decommissioned.
- 21 new lattice supports, 2,373.28 meters of LA-56 conductor line, and 477.53 meters of 95 mm² stranded conductor line are installed.
- New bare overhead line layout from support number 28 to be replaced to support number 15 to be installed, with a layout length of 2,723.28 meters measured on plan.
- New stranded overhead line layout from support number 30 to be replaced to existing support number 35 (former number 42), with 477.53 meters measured on plan.
- New medium voltage underground line layout from support number 15 to be installed to CT LE01031 “Valonga”, with a layout of 421.10 meters and 3x1x240 mm² AL 12/20 kV conductor.
Conversions and Recovered Elements
At the new support number 15, an aerial-underground (A/U) conversion is installed, which is necessary to provide continuity to the underground section that connects to the transformation center. Additionally, at the new support number 6, the disconnecting switch S6256 is reinstalled; it is currently located at support number 22, which is scheduled for decommissioning.
The announcement’s annex lists the affected public domain assets, including the classified livestock route Vereda de Lérida H-00288-Belver de Cinca (Huesca).
Thirty-day period for allegations
Any interested party may examine the project on the public information projects portal of the Government of Aragon (https://www.aragon.es/proyectos-en-informacion-publica/energia) and submit any allegations they deem appropriate within a period of thirty days, starting from the day following the publication of the announcement, through the methods provided for in article 16.4 of Law 39/2015.
Allegations shall be addressed to the Provincial Service of Huesca, using the reference “Public information: reform of LASMT 25 kV Esplús to CT LE01031 Valonga”. The announcement was signed in Huesca on September 11, 2026, by the Director of the Provincial Service of Huesca, Marta P. Rodríguez Vicente.
The reform affects an electrical distribution section in the surroundings of Belver de Cinca, in the Bajo Cinca region, and its processing opens a period during which individuals, city councils, and affected entities can submit observations before the Provincial Service of Huesca resolves the authorization. The replacement of 82 supports and nearly four kilometers of conductor with 21 new structures is part of the technological renovation of the medium-voltage network, with a direct impact on the quality of the supply in the area.
Source: Official Gazette of Aragon, number 194, of October 6, 2026, section V. Announcements, b) Other announcements (official reference: BOA20261006017).