Boletín Oficial de Aragón · 14 Sep 2026 · 2 vistas
Expansion of pig fattening farm in Huerto up to 5,597 places
Por FactBox Admin

The Aragonese Institute of Environmental Management (INAGA) has granted the Integrated Environmental Authorization and has formulated the environmental impact statement for the expansion of a pig fattening operation up to a capacity of 5,597 places (671.64 LSU) in the municipality of Huerto (Huesca). The resolution, dated August 24, 2026, was published in the Official Gazette of Aragon number 178, of September 14, 2026, within section V of announcements.
The action is promoted by José Luis Belloc Fanlo and is processed under file number INAGA 500202/02/2020/00260. The publication is carried out in accordance with article 58.2 of Law 11/2014, of December 4, on Environmental Prevention and Protection of Aragon, which orders the resolution to be publicized in the official gazette.
Location and scope of the project
The expansion will be developed in polygon 505, plot 78, of the municipality of Huerto (Huesca). The project consists of the expansion of a pig fattening operation, an activity that, due to its size, is subject to the integrated environmental authorization regime and an environmental impact assessment.
- Holder: José Luis Belloc Fanlo.
- Affected municipality: Huerto (Huesca).
- Resulting capacity: 5,597 fattening places (671.64 LSU).
- Type of action: expansion of pig fattening operation (code 02A, IEA + EIA).
Procedure and regulatory framework
The resolution is part of the integrated environmental authorization and environmental impact assessment procedure provided for in the Aragonese environmental prevention and protection regulations. INAGA, a body attached to the Department of Environment and Tourism, has processed the file and has resolved to grant the authorization along with a favorable environmental impact statement.
The full text of the resolution can be consulted through the link provided by the Aragonese administration, with the Secure Verification Code CSV7M-54UF0-9UFBU-VZREG. The resolution was signed in Zaragoza on September 1, 2026, by the Head of Technical Area III of Industrial Environment, Diana Remón Galindo.
Relevance for the territory
The expansion of the fattening farm in Huerto represents a significant increase in livestock capacity in the Huesca region, with environmental and neighborhood implications that have prompted the processing of the environmental impact assessment. Publication in the official gazette ensures the transparency of the procedure and allows interested parties to know the conditions imposed in the authorization.
Source: Official Gazette of Aragon, number 178, September 14, 2026, section V (b) Other announcements (official reference: BOA20260914021; file INAGA 500202/02/2020/00260).